Skip to content
TANGTIE

Steel Structures

Connection and anchorage components for portal frames, multi-storey steel frames, bracing systems and equipment structures.

Typical components
4 catalogue items
Specify with
Drawing or site condition
Enquiry
Specification → quotation

The fixing condition

Steel frame erection is a sequence of connections made in the right order with the right parts. Bolts that do not match the grip length, anchors set at the wrong projection or brackets drilled to the wrong pattern all show up as site delays.

We supply the components that sit between the frame members and the foundation: structural bolt sets, foundation anchors, connection brackets and threaded bracing parts. Production is released against the connection drawing, with the packing matched to the member marks so site issue follows the erection sequence.

What to prepare before an enquiry

Connection drawing

Plate thickness, bolt diameter, grip length and hole positions must be fixed before bolt sets are packed.

Foundation detail

Anchor projection, bend geometry and template pattern come from the foundation and base plate drawing.

Exposure class

Internal, sheltered or exposed conditions determine whether zinc plating or hot-dip galvanizing is appropriate.

Send a drawing.

Include the drawing or size list, material and finish, quantity and destination port. The reply can then be a quotable offer, not a general price range.

Steel Structure Fasteners & Connection Parts | Tangtie Metal